1 Day Concrete Coatings for Greater Cleveland, NE Ohio, & Western PA!
✓ 12 Hours - to walk on!
✓ 36 Hours - to move heavy items!
✓ 48 Hours - to drive on!
The J&P Process
Preparation
The concrete is cleaned from any salt or oil residue by diamond grinding. All grinders are hooked up to vacuums to minimize dust.
Repairing the Concrete
Duralast crack filler is used to fill pits and cracks, then ground off smooth with grinder.
Basecoat
Duralast's self priming 100% solids pure polyurea is applied to the floor.
Full Broadcasting Chips
After an area has been base-coated, chips are thrown into the wet base-coat by hand, putting color and texture into the floor.
Scraping the Floor
After the base coat is dry, the floor is scraped with steel blades, then vacuumed to be sure there are no loose chips on the floor.
Top Coat
The last step is to squeegee, then roll out the UV Stable Polyaspartic topcoat.